nRF54L15 Channel Sounding chain—scheduling conflicts with simultaneous initiator and reflector roles

I am using nRF Connect SDK 3.4.1 on three nRF54L15 devices:

A ───────── B ───────── C

A–B: A central / CS initiator
     B peripheral / CS reflector

B–C: B central / CS initiator
     C peripheral / CS reflector

B maintains both connections with fixed CS roles. The application coordinates sounding so only one link runs a CS procedure at a time. Both ordinary ACL connections remain active.

Current configuration:

  • Both CS roles enabled; two CS connection contexts.
  • Both ACL intervals: 30 ms, peripheral latency 0.
  • Maximum ACL event length: 2.5 ms; event extension disabled.
  • Central ACL event spacing setting: 15 ms.
  • CS subevent length: 8 ms; configured CS reservation: 9 ms.
  • Maximum procedure duration: 2 seconds, allowing a complete sweep.
  • CS synchronization PHY: 1M; ACL PHY: 2M.

A–B completes procedures successfully. B–C fails even when only B–C sounding is enabled and A–B remains connected.

In the latest B RTT log, 54 B–C procedures each contain three scheduling-aborted subevents, with reason 0x03, followed by a short subevent containing some measurement steps. No fresh B–C distance results are produced.

B’s anchor reports show approximately 19.4 ms separation in one direction and 10.6 ms in the other, changing gradually over time. The A–B sniffer capture shows a negotiated CS offset of 2.966 ms. We have not measured B–C’s negotiated offset.

My questions are:

  1. Does the controller account for an existing peripheral ACL when selecting the CS offset for its central connection?
  2. Is there a supported API to place or periodically reposition B–C’s ACL anchor relative to B’s A–B peripheral anchor, without disconnecting?
  3. Can the controller maintain that separation despite the independent clocks of A and B? I understand central ACL spacing principally controls central-to-central links.
  4. If that control is unavailable, what scheduling configuration or reference implementation do you recommend for this chain, targeting fresh measurements below one second on both links with complete 72-channel PBR sweeps?
  5. Can controller diagnostics identify the exact reservation causing each scheduling abort? I have RTT and an nRF52840 BLE sniffer.

Please distinguish application timestamp synchronization, such as conn_time_sync, from control of the actual ACL and CS radio schedules.

Parents
  • Does the controller account for an existing peripheral ACL when selecting the CS offset for its central connection?

    No, generally it does not guaranteed-wise.

    When device B acts as a Central to C, its Link Layer controller calculates the CS offset based on its own internal timebase and existing Central schedules. Standard controllers do not natively cross-reference or dynamically offset Central CS procedures against active Peripheral ACL anchor points (like the B–A connection) because B's timing on the B–A link is dictated entirely by Central A.

    As A's clock and B's clock drift independently, the relative timing between B–A's ACL events and B–C's CS events constantly shifts. When B–C CS subevents overlap with high-priority B–A ACL anchors, the Link Layer drops or aborts the CS subevents (producing your 0x03 scheduling-abort reason).


    Is there a supported API to place or periodically reposition B–C’s ACL anchor relative to B’s A–B peripheral anchor, without disconnecting?

    No standard Bluetooth API exists to directly request a precise time offset for an ACL anchor point. You can trigger a Connection Parameter Update procedure on the B–C link. While this forces the controller to recalculate and relocate the B–C anchor point relative to B's active schedules, you cannot pass a specific microsecond offset parameter to the API. To dynamically adjust B–C relative to B–A, custom vendor-specific controller extensions or firmware modifications would be required.

    Can the controller maintain that separation despite the independent clocks of A and B? I understand central ACL spacing principally controls central-to-central links.

    No. Central ACL event spacing settings only align schedules relative to B's internal clock for links where B is the Central. Because A is the clock source for the A–B link and B is the clock source for the B–C link, the two timing domains will continuously drift relative to each other (typically up to ±50 ppm per crystal). Even if B places the B–C link in a wide open time slot initially, clock drift will cause B–A ACL anchor points to gradually sweep across B–C CS reservations (matching your observation where anchor separation shifts between 19.4 ms and 10.6 ms).

    If that control is unavailable, what scheduling configuration or reference implementation do you recommend for this chain, targeting fresh measurements below one second on both links with complete 72-channel PBR sweeps?

    To achieve stable Channel Sounding (CS) updates under 1 second across both links without scheduling collisions, consider the following strategy:

    1. Enable non-zero Peripheral Latency for B on the A–B link. This allows node B to skip listening on selected A–B ACL anchor points when a B–C CS procedure is actively executing, preventing the controller from aborting the CS subevent.

    2. Increase the ACL interval on both links (e.g., from 30 ms to 60 ms or 100 ms). A wider ACL interval creates larger idle windows for the 9 ms CS reservations, drastically reducing collision probability

    Can controller diagnostics identify the exact reservation causing each scheduling abort? I have RTT and an nRF52840 BLE sniffer.

    Since you have an nRF52840 sniffer, capture the over-the-air packets of the A–B link. Overlay the timestamps of B's RTT abort logs with the exact packet timestamps on the A–B sniffer trace. You will see B–C aborts occurring precisely when A–B ACL connection events overlap with B–C's 9 ms CS reservation windows.

    Please let me know if this solves your issue.

    Pallavi

  • Hi Pallavi,

    Thank you. I now have further results using nRF54L15 and NCS 3.4.1.

    The topology remains A–B–C, with B acting as reflector/peripheral toward A and initiator/central toward C.

    Current settings:

    • Both ACLs: 30 ms, peripheral latency 0, 2M PHY.
    • CS subevents: 8 ms, with a 9 ms controller reservation.
    • Continuous procedures every 600 ms, completing all 72 PBR channels.

    After alignment, the latest run had no additional scheduling aborts and normally delivered fresh measurements every 600 ms.

    I currently manage drift by stopping CS, temporarily changing B–C to 31.25 ms, restoring 30 ms, verifying fresh anchors, and restarting. One periodic correction produced approximately 1.77 seconds between fresh fixes on each link. The interval excursion itself took 961 ms.

    Could you clarify these points?

    1. Peripheral latency: Does enabling latency make the SDC actively skip peripheral events to accommodate another link’s CS reservation, or does it only permit skipping? What happens when RAS traffic is pending?

    2. Finer phase correction: SDK 3.4.1 provides bt_conn_le_conn_rate_request() with 125 µs interval units. With CS disabled during the update, is temporarily using approximately 29.625–29.75 ms, then restoring 30 ms, a supported way to make a small backward phase adjustment? Are there limitations when SCI support and CS are enabled in the same application?

    3. Restart overhead: The decoded A–B capture shows LL_CS_IND transmitted at connection event 11785, selecting first CS event 11791. Is the observed roughly 140–150 ms enable exchange followed by this six-event advance expected? Is there any supported configuration that reduces restart latency?

    4. Abort attribution: An nRF52840 capture shows transmitted packets, but not every internal controller reservation. What controller diagnostics would identify the actual reservation responsible for a scheduling abort, beyond timestamp correlation?

    I can provide the synchronized RTT logs and decrypted capture. Which correction strategy would Nordic recommend for minimizing these occasional gaps while preserving complete sweeps?

    Thanks,
    Chris

  • Hi Pallavi,

    A brief update for your review: I have now tested the finer correction using 29.75 ms temporarily, then restoring 30 ms.

    In the latest 15-minute run:

    • Physical correction and verification took approximately 718 ms, improving on the previous 961 ms.
    • Correction-related fresh-fix gaps were approximately 1.4–1.53 seconds.
    • Normal fresh-fix intervals remained 600 ms, with complete 72-channel sweeps and no additional CS aborts after continuous operation began.

    I also instrumented the host/controller boundaries. The complete enable API call takes approximately 166 µs, while API return to the controller’s enable-complete event takes approximately 145 ms. Callback delivery is below 0.3 ms, so host queues and mutex delays are not significant contributors.

    The matched sniffer exchange shows:

    LL_CS_REQ:       event N
    LL_CS_RSP:       event N+2
    LL_CS_IND:       event N+3
    First CS event: event N+9

    One important clarification: my target is less than one second between fresh measurements on every adjacent link, including during correction, as the chain extends to six devices.

    Correcting only B–C while leaving A–B running could contain the interruption, but each downstream link would still experience its own correction gaps. Therefore, protecting only the leader’s link would not meet the requirement.

    With these measurements, is there a supported approach that could meet that requirement, or should I regard these periodic gaps as a practical limitation of the current controller and chain architecture?

    Thanks,
    Chris

  • Hi

    Sorry for delay in response and thank you for your patience. I see that you have run some experiments

    unknown0123456 said:
    Does enabling latency make the SDC actively skip peripheral events to accommodate another link’s CS reservation, or does it only permit skipping?

    No. Peripheral latency just gives the chip permission to skip connection events but it doesn't automatically dodge other tasks on its own. So if you have an measurement data RAS traffic waiting to be sent, then chip will accomodate for that connection event. But If this forced behaviour clashes with anothet task, it can cause a crash or scheduling conflict. This is the reason, you need to turn off channel sounding while fixing time. 

    unknown0123456 said:
    Are there limitations when SCI support and CS are enabled in the same application?

    Because Channel Sounding requires extremely precise timing, changing the connection speed forces the system to completely tear down and restart the CS setup. That teardown and restart is what creates your measurement gaps.

    unknown0123456 said:
    Is the observed roughly 140–150 ms enable exchange followed by this six-event advance expected? Is there any supported configuration that reduces restart latency?

    Bluetooth rules require a multi-step handshake (LL_CS_REQ →→ RSP →→ IND), and the 6-event advance gives the hardware and software enough runway to sync up safely without race conditions. No. There is no supported shortcut or configuration that skips this required handshake overhead when restarting CS.

    unknown0123456 said:
    What controller diagnostics would identify the actual reservation responsible for a scheduling abort, beyond timestamp correlation?

    Over-the-air sniffers only show packets flying through the air; they cannot see internal chip scheduling conflicts or memory bottlenecks. To see what actually caused a scheduling abort, you need to turn on internal controller logs or map the chip's internal states to hardware pins and look at them with a logic analyzer.

    Regards

    Pallavi



  • Hi Pallavi,

    Thank you. In a successful 30 ms ACL baseline run, three corrections completed without new scheduling or synchronization aborts. Normal fresh measurements were approximately 600 ms apart; maximum correction gaps were 1.501 s on A and 1.497 s on C.

    Could you clarify:

    1. Does “tear down” mean disabling/re-enabling CS procedures, or must I remove/recreate the CS configuration and repeat CS security?
    2. Is temporarily requesting 29.75 ms using bt_conn_le_conn_rate_request(), then restoring 30 ms while CS is disabled, supported in NCS 3.4.1?
    3. Your scheduling documentation describes moving an anchor using the connection-update window offset. Is that placement relative only to other local central-role connections, or can B position its central B–C connection relative to its peripheral A–B connection? Does this differ between legacy connection updates and SCI rate requests?
    4. In a separate 60 ms experiment, a same-interval SCI request completed successfully, but measured separation changed only from 36.055 to 36.063 ms. Is retaining the existing phase expected, and is there a supported way to request repositioning?
    5. Exactly which Kconfig options, APIs and tools expose the internal reservation responsible for a scheduling abort? I have RTT and an nRF52840 sniffer.
    6. Adding a Garmin ACL previously produced SDC ASSERT 135,301. Could you decode this for my exact controller revision? I can supply the full assertion log and controller build revision so the crash can be investigated separately from scheduling aborts.

    My goal is to reduce correction gaps while retaining the chain topology and complete PBR sweeps.

    Thanks,
    Chris

  • Hi Chris,

    unknown0123456 said:
    Does “tear down” mean disabling/re-enabling CS procedures, or must I remove/recreate the CS configuration and repeat CS security?

    Teardown” in this context refers to disabling and resetting the active CS procedure context, rather than destroying the underlying ACL connection.

    unknown0123456 said:
    Is temporarily requesting 29.75 ms using bt_conn_le_conn_rate_request(), then restoring 30 ms while CS is disabled, supported in NCS 3.4.1?

    Yes, it is possible using the Shorter Connection Intervals (SCI) but the transition to 29.75 ms doesn't happen instantaneously on the exact next microsecond; it takes a few connection events to negotiate and settle. Immediately reversing it back to 30 ms forces another full negotiation cycle which will create a compiund delay. 

    unknown0123456 said:
    Your scheduling documentation describes moving an anchor using the connection-update window offset. Is that placement relative only to other local central-role connections, or can B position its central B–C connection relative to its peripheral A–B connection? Does this differ between legacy connection updates and SCI rate requests?

    B cannot position its B–C central connection relative to its A–B peripheral connection, because the A–B anchor is not under B's control. B can only position B–C relative to other central-role connections it owns.

    unknown0123456 said:
    In a separate 60 ms experiment, a same-interval SCI request completed successfully, but measured separation changed only from 36.055 to 36.063 ms. Is retaining the existing phase expected, and is there a supported way to request repositionin

    The minor shift observed a quantization artifact of 125 µs step rounding rather than a purposeful phase displacement. 

    unknown0123456 said:
    Exactly which Kconfig options, APIs and tools expose the internal reservation responsible for a scheduling abort? I have RTT and an nRF52840 sniffer.

     

    unknown0123456 said:
    Adding a Garmin ACL previously produced SDC ASSERT 135,301. Could you decode this for my exact controller revision? I can supply the full assertion log and controller build revision so the crash can be investigated separately from scheduling aborts.

    I will need to check this. 

    Regards

    Pallavi

     

  • Hi Pallavi,

    Thank you for clarifying SCI support and the limitations of central-role event spacing. I’ll retain the approach of disabling CS, temporarily changing the interval, restoring 30 ms and verifying the resulting timing.

    Could you explicitly confirm whether I can retain the existing CS configuration and completed CS security, and simply disable/re-enable procedures around the interval updates?

    I look forward to your findings on the internal abort diagnostics and SDC ASSERT 135,301. I can provide the complete assertion log and controller revision.

    Separately, I have narrowed down a sniffer problem. After updating my PCA10059 to firmware 5.0.0 and ble-sniffer 0.22.0, a capture followed B–C through pairing and the 2M PHY transition, but lost following around a legacy 31.25 → 30 ms connection update:

    • The return update selected instant 104.
    • The first captured packet at event 104 had good CRC but bad MIC.
    • Following ended after event 114.
    • RTT confirmed the tags remained connected and continued producing measurements.

    Is this a known sniffer tracking/decryption issue? I have a small capture excerpt showing the sequence.

    Thanks,
    Chris

Reply
  • Hi Pallavi,

    Thank you for clarifying SCI support and the limitations of central-role event spacing. I’ll retain the approach of disabling CS, temporarily changing the interval, restoring 30 ms and verifying the resulting timing.

    Could you explicitly confirm whether I can retain the existing CS configuration and completed CS security, and simply disable/re-enable procedures around the interval updates?

    I look forward to your findings on the internal abort diagnostics and SDC ASSERT 135,301. I can provide the complete assertion log and controller revision.

    Separately, I have narrowed down a sniffer problem. After updating my PCA10059 to firmware 5.0.0 and ble-sniffer 0.22.0, a capture followed B–C through pairing and the 2M PHY transition, but lost following around a legacy 31.25 → 30 ms connection update:

    • The return update selected instant 104.
    • The first captured packet at event 104 had good CRC but bad MIC.
    • Following ended after event 114.
    • RTT confirmed the tags remained connected and continued producing measurements.

    Is this a known sniffer tracking/decryption issue? I have a small capture excerpt showing the sequence.

    Thanks,
    Chris