Posting this as separate question as it got no traction in the other thread:
Why are there many of the same include files in the DFU example directory as in the S110 7...
Hi all,
this is not a question per se but rather a warning to those who are attempting to debug Flash related operations with the SEGGER J-Link GDB Server (v4.84a for Linux...
I debugging some function abnormal after OTA problem, and problem with disappear after redo OTA FW upgrade, duirng it I found a problem about Master Control Panel FW upgrade...
There is an updated field test at the same location from 2022. During the updated field test, we captured more parameters for both LTE-M and NB-IoT devices and, we captured power measurements of the cellular…
Recently, we've updated the SEGGER Embedded Studio Nordic edition (SES) to version 4.16 (SES Nordic Edition is special version of SES built specifically for nRF Connect SDK).
This updated version introduced…
Range testing of any RF scheme is inherently limited by the RF environment, antenna design, tuning and many other factors. The usefulness of range testing is to provide a basis for comparison while keeping…
###Other relevant posts
A concise guide to equipment setup, and how to use the development kit for current measurements can be found here: Measuring current with PCA10040 v0.9.0
A post that describes…
When designing a PCB with nRF51, nRF51822 or nRF51422, there are some rules that should be followed in order to get a good working radio/system, with a maximized range.
General rule
The RF part of the…
2019-02-08: Updated tutorial to cover nRF5 SDK version 15.2.
Introduction
Scope
The following topics will be included in this tutorial:
Configuration of the Scheduler library.
Using the scheduler with…
Scope
Topics that will be covered include:
Before we begin
Necessary equipment and software
Necessary prior knowledge
Setting up the example projects
Background theory
Central and peripheral roles…
2018-11-23: Updated tutorial to cover SDK version 15.2.
2019-02-08: Improved example project (SDK 15.2) and updated instructions accordingly.
Introduction
Scope
The following topics will be included in…
Before we begin
Scope
Topics that will be covered include:
Before we begin
Necessary equipment and software
Necessary prior knowledge
Some basic theory
The Generic Attribute Profile (GATT)
Services…