Subject: Scheduling Conflict During Beacon Scan and Association Between DECT NR+ Nodes (Sink–Relay–Leaf Topology)

Description:

Hello, We are developing a DECT NR+ communication setup using multiple nRF9161 DK boards arranged in a Sink–Relay–Leaf topology.

Each board operates as a DECT node (sink, relay, or leaf) and participates in a bidirectional communication chain. In this setup:

  • Relay nodes must associate both upstream (with the previous node) and downstream (with the next node).
  • All boards begin by starting a beacon, scanning for neighboring beacons, and then initiating association with detected neighboring nodes.

Observed Problem:

When the relay nodes start beaconing followed by beacon scanning and then association, the association step fails with scheduling conflict errors.

Specifically:

  • After all nodes start their beacons and begin scanning, each node detects the neighboring beacons correctly.
  • However, when the association procedure starts between nodes, associations fails with an error related to “scheduling conflict”.
  • This happens most often on relay nodes, which attempt to associate with two neighbors (both uplink and downlink).

Codes:

NRF_MODEM_DECT_PHY_ERR_OP_SCHEDULING_CONFLICT = 0x1004

Regards,

Parents Reply Children