nPM1100 - heavy-duty load in parallel to battery

I want to use the nPM1100 to battery manage, and supply power to the nRF52xxx - along with a heavy duty load ***directly across the battery***, so that full battery voltage and current is available (to drive high-power RGB LED's).

Is this extra load, ***in parallel to the nPM1100***, likely to cause the nPM1100 to detect an error, or in some other way disrupt normal operation?

(I can't see that it would - but I don't know exactly how the nPM1100's error detection circuitry works - the documentation only describes charging faults)

Parents Reply Children
No Data
Related