This post is older than 2 years and might not be relevant anymore
More Info: Consider searching for newer posts

BLE Mesh model Scheduler Setup Server extends Generic Power OnOff Server?

Hi,

While reading the BLE Mesh Model Specification v1.0 I noticed that the Scheduler Setup Server, which extends Scheduler Server and Scene Setup Server, lists the Generic OnPowerUp state in table 5.49 and in Figure 5.1 (the summary).

Beside those two places there is no mentioning in the text that Scheduler Setup Server nor the ones it extends would extend the Generic Power OnOff server model.

I assume that this is an error in the standard, right?

Thanks.

Parents Reply Children
No Data
Related